Grading Criteria for IOC Package #2

1. As-built specs:
OCD (3)
    Check for the proposed system diagram's consistency with the proposed architecture.
SSRD (13)
    Well described implementation and support requirements
    Testable capability requirement description
    Clear prioritization of capability requirements
    System interfaces with all integrated COTS and external sytems to be described
    Evolution requirements should provide details on the proposed evolutionary directions
SSAD and MDL (32)
    Go through the Rose Model and match the model against the
    structure given in
    Tools-->Rationale Rose template for MBASE product models
    Well described entities, use cases, and components
    Software level operations and classs model
        Proper signature descriptions for methods.
        Use of proper associations, aggregations and dependencies
        Completed enterprise model consistent with the entity model in OCD
    Configuration model
        Package and directory structure consistent with the architecture
FRD (2)
    Explanation of business case
    Explanation of risks

Iteration Plan (17)
    1.1 Capabilities to be implemented
        Consistent with LCP
    1.2 Capabilities to be tested
        Clear explanation of testing methods or why the capability is not being tested
    2.1 Schedule
        Should be a MS Project based plan
    2.2 Resources
        All team members should be accounted for.
    2.3 Responsibilities
        Each team member should have clear set of responsibilities with the developers assigned responsibility for individual modules
    3 Approach
        Consistent with the LCP and other parts of CTS documents
    4 Assumptions

Iteration Assessment Report (13)
    1.1 Capabilities Implemented
        Consistent with Iteration Plan 1.1
    1.2 Summary of test results
        Consistent with test reports
    1.3 Open problems
        Consistent with test reports
    1.4 Objectives Reached
        Consistent with Iteration Plan 1.4
    2 Adherence to Plan
        Lessons learned, deadlines missed and achievements
    3 Approach and suggestions
        Suggested changes to approach for next iteration
    4 External Changes Occurred
        Events occurred out of the control of this project that influenced application of the plans
    5 Suggested Actions
        Changes to the architecture, test or concept of operation

Release Description (10)
    1 Inventory released
        List of items released including software, documents and manuals
    2 Compatibility notes
        List of compatible softwares such as browser versions and workarounds
    4.1 New features
        Consistent with Iteration Assessment Report 1.1
    4.3 Upcoming changes
        Consistent with LCP for next iteration
    5 Known bugs
        Consistent with Iteration Assessment report 1.3
    6 Defect and Change Reporting Procedures
        Description of tools and procedures to be used for reporting errors and tracking change, Consistent with QMP 2.6

Quality Management Plan (15)
    1 Purpose
    2.1 Design Guidelines
        Specific criteria to be used for design, optimization and avoiding errors
    2.2 Coding Guidelines
        Specific and complete guidelines, if required reference to external standards to be referenced
        Check for headers, commenting and change/revision control
    2.3 Testing guidelines
        Consistent with test plan
    2.5 Configuration Management
        Identify each item to be placed under CM, where it is to be stored, which tools to be used and the personnel in charge of maintaining the baseline
    2.6 Defect and Change Management
        Procedure and tools for reporting bugs, change requests and defect tracking tools

Test Plan (10)
    2.1 Approach
    Consistent with LCP, SSRD and Iteration Plan for features to be tested
    2.3 Requirements Verification Matrix
    Consistent with 2.1
    3.1 Hardware preparation
        Explanation of hardware required and the the preparation of the hardware such as network connectivity
    3.2 Software preparation
        Installation of software required including the sequence
    3.3 Other pre-test preparations
        Describe where the test data is going to come from
    4.1 Responsibilities and staffing
        Identify who will be responsible for each test reponsibility
    4.3 Schedule for testing
        as per guidelines
    5 Key measures
        Explain the metrics used to measure defects and test progress
    7, 8 Defects and changes
        Consistent with QMP 2.6 and RD 6

Test Reports (20)
    Read the guidelines for grading the section
    2 Test preparation
        Consistent with TP 3
    3 Test specifications
    4 Test procedure specifications
    5 Test incident report
    6 Test log
    7 Test Summary

Inspection Plan (7)
    2 Inspection Items, participants and roles
        Identify the documents, code and designs to be inspected and who participates in inspections
    3 Milestones
        A high level description of the schedule .
    4 Process description
        High level description of the inspection process
    5.1 Defects Severity
        Explanation of each level major and minor with examples
    5.2 Defect Type
        Explanation of each type with examples
    5.3 Category
        Explanation of each category with examples

Inspection Reports (13)
    1 Participants and roles
        Consistent with Inspection Plan 2
    2 Inspection Items
        Consistent with Inspection Plan 2
    3, 4, 5 Defect data
    6 Inspection Statistics
    7 Defect Correction and Rework


Questions or Suggestions