Guidelines

Storing Project Deliverables

To receive their midterm project grades and final project grades, the team must follow the following guidelines:

General Guidelines

Team Project Homepage

Project Name
Team Number
Members:
  • Name of Member 1, Email, Role (Primary, Secondary)
  • Name of Member 2, Email, Role (Primary, Secondary)
  • ....
  • The team website should provide links to each of the artifacts, in their Life Cycle Objective version, and the Life Cycle Architecture version.
  • Note that in this case, the WinWin negotiation link need only point to the HTML report generated by the USC-WinWin tool
  • Life Cycle Objective Life Cycle Architecture
    Operational Concept Description 
    System and Software Requirements Definition 
    System and Software Architecture Description 
    Feasibility Rationale Document 
    Life Cycle Plan 
    Prototypes 
    WinWin Negotiation 
    Architecture Review Board I Presentation 
    Operational Concept Description 
    System and Software Requirements Definition 
    System and Software Architecture Description 
    Feasibility Rationale Document 
    Life Cycle Plan 
    Prototypes 
    WinWin Negotiation 
    Architecture Review Board II Presentation