Grading Criteria for LCA Drafts

20 Points - Due Friday, December 3, 1999

Criterion Points deducted
Operational Concept Description Not accessible from the the web 1
System and Software Requirements Definition Not accessible from the the web 1
System and Software Architecture Description Not accessible from the the web 1
Feasibility Rationale Not accessible from the the web 1
Life Cycle Plan Not accessible from the the web 1
Updated versions of the above five documents for LCA For each one not updated 1
Prototypes Not accessible from the the web 1
WinWin Negotiation Not accessible from the the web 1
COCOMO Missing  1
Rose Model Files Missing 1
Read Me file Missing 1
Directories needed in accordance with the 
Guidelines for Storing Project Deliverables
For each one missing 1
Total 20