CSCI 577a Class Schedule - Fall 2000

Last Updated on 11/16/2000 and to be updated periodically
  (Notes: TCMS= team client meeting survey, ER= Effort Report, PR= Progress Report, RR=Requirements Reading, IR= Inspection Report, EP=Electronic Papers, EC= Electronic Charts, BR=Books on Reserve, MM=Multimedia Tutorials, TT=Tutorials , WR= Walker Royce book chapters, CO=COCOMO II book chapters, IP= Information Paradox )
Date Lecture Speaker Individual Assignment Due (Points) Project (Points) Readings*
M 08/28 MBASE I: SE Trends, Course Overview Boehm, Port     WR 1-4; EC-01; EP-01; EP-02; EP-03; EP-21
W 08/30 MBASE II: Risk Mgmt, Teams & Skills Boehm
Basic questionnaire (2)
Student info questionnaire (5)
  EC-02; EP-13; EP-15, EP-22
F 09/01 MBASE III: EPG, MDM Boehm, Dincel Risk /Model clash analysis (30), Pre project questionnaire (4)   EC-02, EC-03, EP-06, EP-12, EP-16, EP-23, EP-24, EP-26
W 09/06 WinWin Shared Vision Benefits Realization Boehm S&C Analysis (30)   IP 2, EC-04, EP-25
M 09/08 UML/Rose Introduction Port   EC-05, TT-03 
W 09/11 Easy WinWin Tutorial Al Said   Teams formed/Projects assigned EC-06, EP--07
F 09/13 OCD I ,Prototypes Port   EC-07, EP-10(OCD) 
F 09/15 Client information gathering, effective meetings Majchrzak     EC-08
M 09/18 OCD II Port Rose: client use cases (30)  (3)   EC-09, EP-29
W 09/20 User Interface Design Jacobs Results Chain (15), Easy WinWin(15)   EC-10
F 09/22 SSRD I Port     EC-11, EP-10(SSRD)
M 09/25 Inspections Brown ER(3), ER(3) EC-12
W 09/27 Prototyping, WinWin Workshop  Port   PR(2), PR(2)  EC-13
F 09/29 COCOMO      II Boehm     CO (1, 2, 3); EC-14, TT-02
M 10/02
LCP I, MS Project 
Boehm ER(3), TCMS I(3) Prototype(20) WR 10-14, EC-15, EP-10(LCP), TT-01
W 10/04 SSAD I Port Requirements(30) Winwin Report (20), PR(2) EC-16, EP-10(SSRD), EP-27
F 10/06 Library Information Systems Kwan, Lynch   OCD Early Sections (20), IR(10) EC-17
M 10/09 SSRD II Port ER(3)  EC-18
W 10/11 SSAD II: System Analysis Port   PR(2)   EC-19, EP-28
F 10/13 COTS Integration Abts   TCMS II(3)   CO 5(COTS); EC-20; EP-22
M 10/16 FRD Boehm COCOMO II (30) ER(3) EC-21; EP-10(FRD)
W 10/18 ARB’s, Presentation, Documentation Boehm   PR(2) EC-22, EP-15
F 10/20 Software Architectures Neno     EC-23
M 10/23 LCP II Boehm ER (3) LCO drafts on Web(15)
W 10/25 LCO Workshop Port   PR(2) EC-24
F 10/27 Software Quality Brown TCMS III (3)    CO 5 (COQUALMO); EC-25
M-F 10/30-11/03 LCO ARB's ER (3) LCO ARB (15), PR(2)
M 11/06 SSAD III: System Design Port ER (3), Quiz I (5) LCO Packages due (140), IR(15) EC-26; EP-30
W 11/08 SSAD IV: System Design Port   PR(2) EC-27
F 11/10 MBASE and Startup Companies Mehta     EC-28
M 11/13 CTS Planning, System Design, LCO Review Feedback Boehm, Port ER(3), Quiz II (5) EC-29, EP-10(CTS)
W 11/15 LCA LCP Preparation ; MS Project Boehm, Dincel   PR(2) EC-30;  EP-32
F 11/17 Requirements Inspection Shull TCMS IV(3) , Quiz III (5)   EC-31; EP-31
M 11/20 Software CMM and CMMI Hefner ER (3) , MS Project (30) EC-32
W 11/22 System Design Port PR(2) EC-33
M 11/27 Digital Libraries Campbell ER (3), Quiz IV (5)  
W 11/29 LCA Workshop Port   PR(2), LCA Drafts on Web(15), RR(10)
F 12/01 Leeway TCMSV (3)  
M-F 12/04 -12/08 LCA ARB's ER (3) LCA ARB(15), PR(2)
M 12/11 No class ER (3) LCA Packages Due(160),  IR(15)
W 12/13 No classs Individual Critiques (160), Post-project questionnaire (4), Individual Contribution (25) PR(2)Archiving(20)

COCOMO(15)

Client Evaluation(20)